Tel:+86-51262839639     E-mail:sales@xoways.com
XOWAYS(Group Unified Brand)
  • Kill Manifold
  • Kill Manifold

    • 0.00
      0.00
Delivery Photo


STANDARD COMPLIANCE:

Basic Design: API 6A, API16A, API16C

Face to Face Dimension: API6A and manufacturer standard

End Flange Dimension:API6A

B.W. Ends: ASME B16.25

NPS: 1 13/164 1/16

Class:2000PSI20000Lb

Type of Operation: Handle, Hydraulic

Main Material: AA, BB, CC, DD, EE, FF, HH

Inspection & Test: API6A

Other Special Requirement shall be on request


PRODUCT DESCRIPTION:

The words Christmas Tree and Wellhead are often used interchangeably in the oil and gas industry. However, a wellhead and a Christmas tree are entirely separate equipment. They are both vital to gas and oil production, and they each have valves and other equipment that aids in controlling and guiding the flow of materials. 

 

A wellhead is necessary to control the pressure during drilling and production. It is located on the surface of the well between the casing and the drilling floor, allowing safe and controlled access to a live well. The wellhead suspends the casing and provides pressure seals for the casing string. It supports the BOP (Blowout Preventer) during drilling, the FRAC Tree during completion, and a Production Christmas Tree after completion. The wellhead is present during the drilling, completion, and production phases.

 

The Christmas Tree's primary purpose is to control the flow of resources—typically oil or gas—into and out of a well during production. The Christmas tree arrives and is attached to the wellhead after finalizing the drilling process. The Christmas Tree is a series of valves, spools, gauges, and chokes. 

 

Choke and Kill Manifold is used to control well kick and pressure. In case of well kick or blowout, Choke Manifold may control downhole pressure by valves open/close. Heavy slurry may be pumped into well by Kill Manifold to reach pressure balance. Besides, Choke Manifold can be applied to well cleanup and blow-off.